EasyManuals Logo

GE LOGIQ P6 Series User Manual

GE LOGIQ P6 Series
484 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #323 background imageLoading...
Page #323 background image
GE HEALTHCARE
DIRECTION 5394152, Revision 5
LOGIQ™ P6/P6 PRO SERVICE MANUAL
Chapter 8 - Page 8-97
8-2-45 AP950 Assy
8-2-45-1 Tools
Common Phillips screwdrivers
Allen/Unbraco wrench
8-2-45-2 Preparations
Shut down the system and switch off the main breaker.
8-2-45-3 Removal procedure
To detached the AC Power assy, All open 4 pcs console cover that are left, right, front, rear cover.
1.) Remove side left cover and right side cover. Refer to the 8-2-14 "Right or Left Side Cover" on page
8-48 and 8-2-14 "Right or Left Side Cover" on page 8-48.
2.) Remove rear side cover and front cover. Refer to the 8-2-15 "Front Cover" on page 8-50 and 8-2-
16 "Rear Cover" on page 8-52.
3.) Unscrew 2 M4 screws and 2 Hexa screws on the front of AC trans box.
4.) Loosen 2 Hex (left side in Figure 8-144)screws and 4 M4 screws (right side of Figure 8-142).
Figure 8-141 4 screw on the front of the AC TRANSBOX
Figure 8-142 Back of the AC TRANSBOX

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P6 Series and is the answer not in the manual?

GE LOGIQ P6 Series Specifications

General IconGeneral
Power Supply100-240 VAC, 50/60 Hz
Imaging ModesB-Mode, M-Mode, Color Doppler, Power Doppler
ApplicationsVascular, Musculoskeletal
Operating Temperature10°C to 40°C
Display15-inch LCD
Relative Humidity20% to 80% (non-condensing)

Related product manuals