v 2.3 — September 2015 Altanium Delta3
14 Startup Procedure Checklist
3. Make sure the main input power disconnect is in the OFF position.
4. Connect the controller to the power source.
3.3 Startup Procedure Checklist
NOTE:There are no controller to mold interconnection details included in this User Guide.
If this information is required, please call the nearest Husky Regional Service and Sales
office.
Item Step
1 Connect power/thermocouple cables between the mold and controller (if
required).
2 Connect the I/O box or option cables (if required).
3 Connect the controller to the power source.
4 Switch the controller ON.
5 Login to the system (if required).
6 Select the required mold setup.
7 Verify the mold setup is the correct one by checking the name and setpoints in
the preview window.
8 Correct any faults found during diagnostics.
9 Touch START to run the system.
10 Check that the controller is functioning correctly by monitoring the Graphical
View/Text View screen.
IMPORTANT!
When turning off the system, wait 30 seconds before turning the main disconnect switch
back on. Turning the system off and on incorrectly may result in system communication
problems.