Operation
154
Pos: 48.95.23 / BA/Bedienung /R undballenpres se/Garnbindung C omprima/G arn führen nac h Garnrollen1_ Bild_Comprima @ 342\mod_ 1433138076088_ 78.docx @ 2 593074 @ @ 1
Fig.
Pos: 48.95.24 / BA/Bedienung /R undballenpresse/ Garnbindung C omprima/Garn führen nach G arnrollen1_Te xt_Comprima @ 388\mod _1445353058 070_78.docx @ 27 79361 @ @ 1
• Lead the four twines coming from the twine rolls through the twine guides (1) towards the
twine brake (2).
• Lead the four twines through the front twine guides (3) first, then between the both sheets of
the twine brake (2) and then through the rear twine guides (4).
Pos: 48.95.25 / BA/Bedienung /R undballenpresse/ Garnbindung C omprima/Garn führen nac h Garnrollen2_ Bild_Comprima @ 342\mod_ 1433142001876_ 78.docx @ 2 593488 @ @ 1
Fig.
Pos: 48.95.26 / BA/Bedienung /R undballenpres se/Garnbindung C omprima/G arn führen nac h Garnrollen2_T ext_Compri ma @ 342\mod _1433142003 311_78.docx @ 25 93519 @ @ 1
• Run the left two twines (2) from the twine brake (4) through the twine guides (1) and (3) to
the rubber roller (5).
Pos: 48.95.27 / BA/Bedienung /R undballenpresse/ Garnbindung C omprima/Garn führen_Garne nden über Gu mmirolle_Text_C omprima @ 3 43\mod_143 3147654184_7 8.docx @ 25 93834 @ @ 1
• Place the ends of the twine between the rubber roller (4) and pressure roller with at least 25
cm overhang.
Pos: 48.95.28 / Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196 175311226_0. docx @ 4165 @ @ 1