Operation
169
Pos: 48.101 /Übers chriften/Übersc hriften 2/P-T /RRollboden sp annen und F edervorspann ung einstellen @ 79\mod_13146 90152708_78.d ocx @ 697584 @ 2 @ 1
11.20 Tighten the floor conveyor and set the spring pretensioning
Pos: 48.102 /Abkürz ungen /Ab kürzungen sprach neutral/Rund ballenpressen/C omprima F 1 25 (XC) @ 26 2\mod_1399898 256615_0.doc x @ 2000262 @ @ 1
Comprima F 125 (XC)
Pos: 48.103 /BA /Bedienung /R undballenpresse /RollbodenSpa nnen des Rollbo dens (COMPRIM A F125) @ 7 9\mod_13 14628031949_78. docx @ 69729 3 @ @ 1
Fig.
The rear floor conveyor can be retensioned with the set screw (1). The floor conveyor is
correctly pretensioned if the tension lever (2) “a” = 5 mm is raised up from the groove (4) of the
support (3).
Adjusting the Floor Conveyor:
Loosen the screws (5)
3. Raise the support (3) with the set screw (1) until dimension "a" = 5 mm is reached.
4. Tighten the screws (1).
5. Check the dimension “b”, it must be 480-490 mm from the inside of one eyelet to the next
and must not be changed.
Note
The screws can also be moved to position "c".