EasyManua.ls Logo

Oracle X7-2 - Page 160

Oracle X7-2
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install the Front Indicator Module
3.
If not installed, install the FIM cable through the plastic temperature sensor
housing [1].
4.
Connect the FIM cable to the replacement FIM assembly [1, 2].
5.
Using a Phillips screwdriver, tighten the two screws to secure the temperature
sensor housing to the FIM assembly [2].
6.
Carefully insert the FIM assembly into the front panel of the server chassis [3].
7.
Install and tighten the two Phillips screws to secure the FIM assembly to the
server chassis [3].
8.
Return the server to operation.
a.
Return the server to the normal rack position.
See “Return the Server to the Normal Rack Position” on page 212.
160 Oracle Server X7-2 Service Manual • October 2017

Table of Contents

Other manuals for Oracle X7-2

Related product manuals