Remove the Internal HBA Cables
a.
Power off the server and disconnect the power cords from the power
supplies.
See “Powering Down the Server” on page 53.
b.
Extend the server to the maintenance position.
See “Extend the Server to the Maintenance Position” on page 59.
c.
Attach an antistatic wrist strap to your wrist, and then to a metal area on the
chassis.
See “Take Antistatic Measures” on page 61.
d.
Remove the server top cover.
See “Remove the Server Top Cover” on page 62.
180 Oracle Server X7-2 Service Manual • October 2017