EasyManua.ls Logo

YASKAWA V1000 Series

YASKAWA V1000 Series
470 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
118 YASKAWA TM.V1000.01 V1000 Drive Installation & Start-Up Manual (Preliminary 01-19-07)
4.3 Start-up Flowcharts
4.3 Start-up Flowcharts
The flowcharts in this section summarize basic steps required to start-up the drive.
Use the flowcharts to determine the most appropriate start-up method for a given
application. The charts are intended as a quick reference to help familiarize the user
with start-up procedures. Refer to Basic Parameter Adjustments on page 124 and
perform all checks to ensure a proper drive start-up.
Flowchart Objective Page
A Basic start-up sequence for drive operation. 119
B V/f Motor Control Set-Up 120
C
Operation in Open Loop Vector Control (OLV) (high performance and high precision
operation without an encoder).
121
D
Operate a permanent magnet (PM) motor in OLV Control (compatible with both IPM and
SPM motors).
122
E Set-up of drive using application specific selections. 123

Table of Contents

Other manuals for YASKAWA V1000 Series

Related product manuals