EasyManua.ls Logo

Daewoo Mega 500-V - Page 214

Daewoo Mega 500-V
686 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
S0602170K
Page 109
Axle (ZF AP 420R)
2. If necessary (according to the Version).
insert hex. head screws into the drive
flange bores and press dust shield over
the drive flange collar.
3. Insert drive pinion into the axle carrier and
assemble heated inner bearing race until
contact is obtained.
Figure 251
Figure 252
Figure 253

Table of Contents

Related product manuals