EasyManua.ls Logo

Doosan H2017 - End Effector I;O Testing

Doosan H2017
253 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
113
7.6.3 End Effector I/O Testing
To test the operation status of the connected end effector, follow the procedure below.
1 Select the end effector to test and tap the Edit button.
2 Tap the On/Off button of the Signal to test the output signal.
3 Select a function among the Workcell Item Actions and tap the Test button to test the end effector
function.
4 Check whether the end effector receiving the output signal operates normally.
Note
If the input signal is entered properly, a green indicator lights up.

Table of Contents

Other manuals for Doosan H2017

Related product manuals