EasyManua.ls Logo

Doosan H2017 - Load Saved Tasks

Doosan H2017
253 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
163
9.1.5 Load Saved Tasks
To load a saved task, follow these steps:
1 Tap Saved Files on the main screen of Task Writer.
If a task is being edited, tap the Menu button and tap Open.
2 Select a task to open from the file list and tap the Open button.
3 Searches for tasks in the file list can be made using the filter function.
Search in latest, oldest, alphabetical order, and reverse order is possible.
Note
Even if the model where the task was created is different, the task can be loaded on any M-Series
model. However, the M-Series and A-Series are not mutually compatible.

Table of Contents

Other manuals for Doosan H2017

Related product manuals