EasyManua.ls Logo

GE P24DM - Performance of Monitoring and Control Functions; Voltage Transformer Supervision; Current Transformer Supervision; CB State and Condition Monitoring

GE P24DM
600 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 PERFORMANCE OF MONITORING AND CONTROL FUNCTIONS
7.1 VOLTAGE TRANSFORMER SUPERVISION
Fast block operation < 25 ms
Fast block reset < 40 ms
Time delay +/- 2% or 40 ms, whichever is greater
7.2 CURRENT TRANSFORMER SUPERVISION
IN> Pick-up Setting +/- 5%
VN< Pick-up Setting +/- 5%
IN> Drop-off 0.9 x setting +/- 5%
VN< Drop-off 1.05 x setting +/-5% or 1 V, whichever is greater
Time delay operation Setting +/-2% or 20 ms, whichever is greater
CTS block operation < 1.1 cycles
CTS reset < 40 ms
7.3 CB STATE AND CONDITION MONITORING
Timers +/- 40 ms or 2%, whichever is greater
Broken current accuracy < +/- 5%
7.4 PSL TIMERS
Output conditioner timer Setting +/- 2% or 50 ms, whichever is greater
Dwell conditioner timer Setting +/- 2% or 50 ms, whichever is greater
Pulse conditioner timer Setting +/- 2% or 50 ms, whichever is greater
7.5 DC SUPPLY MONITOR
Measuring Range 19 V-310 V ±5%
Tolerance ±1.5 V for 19-100 V
±2% for 100-200 V
±2.5% for 200-300 V
Pickup 100% of Setting ± Tolerance *
Dropoff Hysteresis 2%
102% of Setting ± T
olerance for the upper limit *
98% of Setting ± Tolerance for the lower limit *
Operate Time Setting ± (2% or 500 ms whichever is greater)
P24xM Chapter 21 - Technical Specifications
P24xM-TM-EN-2.1 445

Table of Contents

Related product manuals