FusionModule2000 Smart Modular Data Center 
Installation Guide 
4 (Optional) Installing Bases 
 
Huawei Proprietary and Confidential                                     
Copyright © Huawei Technologies Co., Ltd. 
 
Figure 4-10 300 mm wide air conditioner base 
 
 
Preparations 
Tool: Phillips screwdriver 
Material: air conditioner base (300 mm wide) 
Document: base installation position diagram 
Procedure 
Step 1  Remove the four M6 screws from adjustable feet and set them aside. 
Figure 4-11 Removing screws from adjustable feet 
 
 
Step 2  Move the adjustable feet to the mounting holes on the base according to the depth of the air 
conditioner.