Figure 15-8 Installing a VCN500
Step 4 Connect the VCN500 power cable to the rPDU.
----End
15.1.3 (Optional) Installing a LAN Switch
Preparations
Tool: Phillips screwdriver
Materials: LAN switch and accessories
Document: installation position diagram for monitoring devices in the network cabinet
Procedure
Step 1 Determine the mounting holes for a LAN switch based on the installation position diagram for
monitoring devices in the network cabinet, adjust the guide rails, and install floating nuts.
Step 2 Install the mounting ears delivered with the LAN switch, and secure the LAN switch to the
rack rails in the front of the cabinet.
This section describes only the installation method. The actual product appearance prevails.

Table of Contents

Other manuals for Huawei FusionModule2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule2000 and is the answer not in the manual?

Huawei FusionModule2000 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule2000
CategoryStorage
LanguageEnglish

Related product manuals