EasyManuals Logo

Huawei FusionModule2000 User Manual

Huawei FusionModule2000
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #220 background imageLoading...
Page #220 background image
FusionModule2000 Smart Modular Data Center
Installation Guide
15 Installing Monitoring Devices
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
211
Figure 15-47 Installing a button
Step 2 Remove the buckle from the button mounting position, as shown by (2) in Figure 15-47.
Step 3 Secure the button to the post using the nut delivered with the button, as shown by (3) in
Figure 15-47.
Step 4 Route the button cable out of the cable hole in the upper part of the post and then into the
upper frame mounting kit of the end door.
Step 5 Reinstall the post side plate, as shown by (4) in Figure 15-47.
----End
15.4.9 Installing a Monitoring Device on the Pad Mounting Kit
The BOM number of the pad mounting kit is 21242016.
In dual-row aisle containment scenarios, install the pad mounting kit on the end door
hanger marked with R at the PDC.
In single-row aisle containment scenarios, install the pad mounting kit on the end door
hanger at the PDC.

Table of Contents

Other manuals for Huawei FusionModule2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule2000 and is the answer not in the manual?

Huawei FusionModule2000 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule2000
CategoryStorage
LanguageEnglish

Related product manuals