7 Installing Air Conditioners
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
76
Figure 7-8 Installing a top frame
----End
7.2 (Optional) Installing NetCol5000-A 42 kW Air
Conditioners
For details, see the document delivered with the equipment or obtain the required document
according to the section "Documentation Preparations."
If there are bases, install air conditioners on the bases.
The installation of air conditioner top frames applies to scenarios with top or bottom pipe routing.
Choose either scenario.
7.2.1 (Optional) Installing a 600 mm Wide Air Conditioner
Enclosure Frame
Context
To increase the equipment depth to 1200 mm, install enclosure frames whose BOM number is
21242025 on the front doors of air conditioners.

Table of Contents

Other manuals for Huawei FusionModule2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule2000 and is the answer not in the manual?

Huawei FusionModule2000 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule2000
CategoryStorage
LanguageEnglish

Related product manuals