FusionModule2000 Smart Modular Data Center
Installation Guide
7 Installing Air Conditioners
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
72
7.1.3 (Optional) Installing a 300 mm Wide Air Conditioner
Adaptive Frame
Context
If an odd number of 300 mm wide air conditioners are installed, an adaptive frame
should be installed so that the lengths of the two cabinet rows are the same. The BOM
number of an air conditioner adaptive frame is 21242047.
An adaptive frame consists of a front panel, a rear panel, and a top panel. The front panel
and rear panel are the same.
Preparations
Tool: Phillips screwdriver
Materials: front panel, rear panel, top panel, connecting kit
Procedure
Step 1 (Optional) If the cabinet depth is 1200 mm, use three M4x10 screw assemblies to assemble
the top panel.
Figure 7-4 Assembling a top panel
Step 2 Use M4x10 screw assemblies to secure connecting kits to the front and rear panels.

Table of Contents

Other manuals for Huawei FusionModule2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule2000 and is the answer not in the manual?

Huawei FusionModule2000 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule2000
CategoryStorage
LanguageEnglish

Related product manuals