FusionModule2000 Smart Modular Data Center
Installation Guide
7 Installing Air Conditioners
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
74
Figure 7-6 Securing an adaptive frame
Step 4 Install the rear panel in the same way.
Step 5 Use four M4x10 screw assemblies to secure the top panel to the front and rear panels, as
shown by (1) in Figure 7-7.
Do not over-tighten the top panel of the adaptive frame. Otherwise, the top panel will be
uneven.