EasyManua.ls Logo

Metrohm 900 - 13 GLP Manager

Metrohm 900
553 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
■■■■■■■■■■■■■■■■■■■■■■
13 GLP manager
900 Touch Control
■■■■■■■■
129
13 GLP manager
Main dialog: System GLP manager
In the GLP manager you can document data for various GLP tests. The
results of the automatic system tests carried out after switching on are
also documented.
The following tests can be documented:
GLP test "Measurement" (see chapter 13.3, page 131)
GLP test "Titration" (see chapter 13.3, page 131)
System validation (see chapter 13.4, page 135)
In addition, you can also:
Create a list with your test tools (see chapter 13.2, page 130).
Define a service interval for having routine maintenance carried out by
a Metrohm service technician (see chapter 13.5, page 139).
Define an interval for the regular performance of backups (see chapter
13.5, page 139).
Further information about quality management and validation is also given
in the documentation series Quality Management with Metrohm and
Application Bulletin AB 252 (Validation of Metrohm titrators (potentio-
metric) in accordance with GLP/ISO 9001).
The table shows the last time that each test was carried out and when the
next test is to be carried out. A test is entered in the list the first time that
it is documented.
[Test tools]
Configuring the test tools for GLP tests (see chapter 13.2, page 130).

Table of Contents

Related product manuals