EasyManua.ls Logo

Metrohm 900 - 4 Installation; Setting up the Instrument; Packaging; Checks

Metrohm 900
553 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.1 Setting up the instrument
■■■■■■■■■■■■■■■■■■■■■■
10
■■■■■■■■
900 Touch Control
4 Installation
The connection between the Touch Control and the control instrument
(Titrando, etc.) is described in the respective manual, as is the configura-
tion of the titration system with its peripheral devices, e.g. stirrers and
dosing devices.
4.1 Setting up the instrument
4.1.1 Packaging
The instrument is supplied in protective packaging together with the sepa-
rately packed accessories. Keep this packaging, as only this ensures safe
transportation of the instrument.
4.1.2 Checks
Immediately after receipt, check whether the shipment has arrived com-
plete and without damage by comparing it with the delivery note.
4.1.3 Location
The instrument has been developed for operation indoors and may not be
used in explosive environments.
Place the instrument in a location of the laboratory which is suitable for
operation and free of vibrations and which provides protection against
corrosive atmosphere and contamination by chemicals.
The instrument should be protected against excessive temperature fluctua-
tions and direct sunlight.

Table of Contents

Related product manuals