Trainee Guide TR-L2-M2000
Level 2 Maintenance Training – M2000 Dispensing Systems 2-2-1 P/N 73-0018-00 (Revision B)
Outline Sheet 2-1-1
Power Distribution
A. Introduction
AC power enters the dispensing system from the facility power source at the Main Power
Inlet. From there, it runs through the Main Circuit Breaker to the Power Manager. The
Power Manager supplies power directly to several system components, which in turn
supply power to other components.
B. Enabling Objective
2.1 Understand the M-2000 power distribution and the functions of each component.
C. Topic Outline
1. Introduction
2. Overview
Power Manager
24/48 DC Power Supply
Interconnect PCA
Computer
Moritex Light Source
Computer Cards
Servo Motor
Stepper Motor
Rotary Encoders
Linear Encoders
Hall Sensors
XYZ Home Limit Sensors
3. Summary and Review