EasyManua.ls Logo

Phoenix Contact PSRmodular - Resource Allocation

Phoenix Contact PSRmodular
236 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PSRmodular Software: Basics
109241_en_03 PHOENIX CONTACT 47 / 232
4.2.11 Resource allocation
Executing this command ( icon in the standard tool bar) shows all the elements that are
used, such as inputs, outputs, status, external input signals (EI), and external output signals
(EQ).
Figure 4-9 Example of resource allocation
NOTE:
The validation function only evaluates the conformity of the programming and the config-
uration of the hardware in relation to the configuration rules of the PSRmodular system.
This validation therefore does not guarantee that the configuration corresponds to the re-
quirement specification (SRS). This should be evaluated as part of an overall validation.

Table of Contents