EasyManuals Logo
Home>Agilent Technologies>Medical Equipment>5DX

Agilent Technologies 5DX Service Guide

Agilent Technologies 5DX
276 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #266 background imageLoading...
Page #266 background image
10-42 Maintenance
Software Diagnostics 5DX Series 3
Software Diagnostics
Check the Inner Barrier Encoders
Maintenance Frequency: Monthly
Estimated Time: Five minutes
Required Items:
None
Prerequisite:
Position the main stage Z axis to the load/unload position. (Approximately 400mil
inches.) From the Calib directory, copy the machine.cfg file to machine.bak.
Procedure:
1. Select XYZ Stage > Inner Barrier Setup from the Service menu and press
Enter.
2. Accept the recommended defaults when prompted.
3. Compare the new inner barrier encoder positions in machine.cfg to the encoder
positions recorded in machine.bak.
The encoders are good and the inner barrier is operating normally if the
difference in the new and old positions is less than four counts. If it is greater
than four counts, call the Agilent Response Center for assistance.
4. Return the system to normal operations.

Table of Contents

Other manuals for Agilent Technologies 5DX

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 5DX and is the answer not in the manual?

Agilent Technologies 5DX Specifications

General IconGeneral
BrandAgilent Technologies
Model5DX
CategoryMedical Equipment
LanguageEnglish

Related product manuals