Agilent 5DX Service Guide 10-11
5DX Series 3 General Maintenance
d. Click on Edit. Click on Edit Copy To. Type a valid path and filename.
7. Compare this printout to the previous values from the last month’s printout. If
there are major differences between the X-ray Current and the Filament
Current of the Focus and Control Grids, contact the Agilent Response Center.
8. The X-ray Tube (psi) should read between 50 and 65 psi.
9. Insert the new printout in the System Log book.
Check X-ray Tube Dielectric Pressure
Maintenance Frequency: Monthly
Estimated Time: Ten minutes
Required Items:
None
Prerequisite:
The 5DX System needs to be powered up and running.
Special Notes:
None
Information:
None
Procedure:
1. Select Utilities from the User Interface Menu and press Enter.
2. Select Service Menu and press Enter.
3. Select X-ray and press Enter.
4. Select HV Power Status and press Enter.
5. The 5DX X-ray Subsystem Monitor window will appear. Monitor the reading
of the dielectric pressure shown in Figure 10-3.