10-22 Maintenance
Main Cabinet Maintenance 5DX Series 3
Main Cabinet Maintenance
Check the Vac-Ion Power Supply
Maintenance Frequency: Monthly
Estimated Time: Ten minutes
Required Items:
Digital Volt Meter (0.1 millivolt sensitivity)
Test leads
BNC-to-Banana Plug Adapter
Service Log Book (used to compare readings)
Prerequisite:
The 5DX System needs to be powered up and running.
Special Notes:
The VacIon Power Supply is located under the Main Cabinet at the rear of the 5DX
System.