S0705010
Page 16
Cylinders
Return to Master Table of Contents
7. Place continuous backup ring in warm
water. See Figure 21. Water temperature
should be 30 - 50˚C (86 - 122˚F). Leave
ring in water for 2 - 3 minutes. Slide
continuous backup ring (2, Figure 20) over
cylinder head and into its groove.
8. Install an O-ring over each of backup
rings. See Figure 22.
9. Use a seal installing jig to install dust seal
into cylinder head. See Figure 23. Install
snap ring.
Figure 21
Figure 22
Figure 23