PEL-2000A Series User Manual 
38 
Installation 
The installation chapter describes how to load the different load 
modules, install the optional GPIB card, the rack mount kit and 
how to determine each channel number. 
If you need to move all installed device to another location, please 
disassembly the modules first, and then reassembly the modules 
after moving to the desired location. 
Load Module Installation 
 
To avoid static electricity, please use appropriate anti-
static work practices.  
The PEL-2004A and PEL-2002A can accommodate 4 
and 2 load modules, respectively. Module loads can 
have 1 or 2 channels. Installation of load modules is 
the same for both models. 
1.  Ensure the mainframe is turned 
off from the rear panel. 
Disconnect the power cord. 
2.  Slide the module onto the rails of an empty 
load slot.