PEL-2000A Series User Manual
38
Installation
The installation chapter describes how to load the different load
modules, install the optional GPIB card, the rack mount kit and
how to determine each channel number.
If you need to move all installed device to another location, please
disassembly the modules first, and then reassembly the modules
after moving to the desired location.
Load Module Installation
WARNING
To avoid static electricity, please use appropriate anti-
static work practices.
The PEL-2004A and PEL-2002A can accommodate 4
and 2 load modules, respectively. Module loads can
have 1 or 2 channels. Installation of load modules is
the same for both models.
1. Ensure the mainframe is turned
off from the rear panel.
Disconnect the power cord.
2. Slide the module onto the rails of an empty
load slot.