TUTORIALS
113
Channel Control
The Channel Control connectors on the rear panel can be used to
control and monitor the status of up to 8 channels. For more
information on channel control, see page 89.
DUT
DUT
DUT
DUT
External control
Ensure the load and PEL-2000A
series mainframe is turned off.
Choose the appropriate load
module(s).
Connect the terminals to the DUT.
Connect the channel control
connectors on the rear panel.
Turn on the PEL-2000A series
mainframe and DUT (load).
Select the Mode* and Range* via
the front panel.
CC Pages 128,
128
CV Page 141
Activate channel control for each
channel that will be used for
external control, i.e., set CH CONT
to External.