EasyManua.ls Logo

GW Instek PEL-2000A Series - Page 114

GW Instek PEL-2000A Series
324 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PEL-2000A Series User Manual
114
8. Run
Run the load. Turn the load on by
either outputting an active low
signal to the appropriate channel
control connector or control
connector, or press the LOAD key
on the load module or
mainframe**.
Page 57 & 89
9. Monitor
Use IMON and VMON to monitor
the current and voltage of load
outputs.
Page 89
10. End
To turn the load off, output an
active high signal to the channel
control connector, or press the
LOAD key on the load module or
mainframe**.
* Mode and Range cannot be configured via the
Channel Control (CH CONT) interface. Mode and
Range can only be configured via the front panel.
** The LOAD key cannot always be used to turn
on/off the load. See page 89 for details.

Table of Contents

Related product manuals