FusionModule2000 Smart Modular Data Center
Installation Guide
4 (Optional) Installing Bases
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
43
Figure 4-3 Measuring the ESD floor height
2. Adjust the base height to H and tighten the height locking bolts on the feet.
Figure 4-4 Tightening height locking bolts
Step 2 Assemble the base.
1. Adjust the base depth based on the cabinet depth.
2. Tighten the bolt assembly on the telescopic rod.