EasyManua.ls Logo

Juniper MX960 - Page 203

Juniper MX960
761 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 80: MX960 Site Preparation Checklist
DatePerformed ByFor More InformationItem or Task
“MX960 Router Environmental
Specifications” on page 180
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
“MX960 Cabinet Size and
Clearance Requirements” on
page 187,
“MX960 Rack Requirements” on
page 183
Select the type of rack or cabinet.
“MX960 Cabinet Size and
Clearance Requirements” on
page 187,
“MX960 Rack Requirements” on
page 183,
“Clearance Requirements for
Airflow and Hardware
Maintenance for the MX960
Router” on page 185
Plan rack or cabinet location, including
required space clearances.
“MX960 Rack Requirements” on
page 183
If a rack is used, secure rack to floor and
building structure.
Acquire cables and connectors.
“MX960 Router Grounding
Specifications” on page 197
Locate sites for connection of system
grounding.
Measure distance between external power
sources and router installation site.
“Calculating Power Budget and
Power Margin for Fiber-Optic
Cables” on page 191
Calculate the optical power budget and
optical power margin.
RELATED DOCUMENTATION
Installing an MX960 Router Overview | 263
Unpacking the MX960 Router | 249
182

Table of Contents

Other manuals for Juniper MX960

Related product manuals