Starting/switching off the engine – for crane operation
10.2 Starting the engine – from the crane cab
10 - 4 3 302 819 en Operating manual
GMK3060
13.12.2018
10.2.2 Checks before starting the engine
Checks on
the carrier
All checks and switch positions for the first engine start of the day must be
performed;
à p. 10 - 1.
Checking the
hand-held control
Hand-held control removed
• Check that the bridging plugs are inserted into all sockets for the hand-held
control;
à p. 14 - 43.
Hand-held control connected to the superstructure
After starting the engine, you can use the hand-held control to execute all
functions which are provided from this socket.
10.2.3 Switching on the ignition
H
Do not start the engine until the CCS display shows a menu (usually the Enter
rigging mode menu).
The control levers must be at their initial positions.
• Turn the ignition key to position 1.
The ignition is switched on.
– A query regarding the control lever positions is displayed (depending on the
installed equipment);
à Control lever deflection query, p. 10 - 5.
– The switching states are compared;
à Comparison of switching states,
p. 10 - 6.