Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual 3 302 819 en 12 - 7
GMK3060
13.12.2018
6. Switch off the engine; p. 10 - 11
7. If necessary, remove the anemometer and air traffic control light;
à Anemometer and air traffic control light, p. 12 - 101.
8. If necessary, remove the camera from the main boom;
à Cameras for crane operation, p. 12 - 106.
9. Fold in all mirrors for crane operation;
à Folding the mirrors in and out, and
adjusting them, p. 12 - 105.
Pivot down the slewable spotlights;
à p. 11 - 134
The lighting on the outrigger must be switched off;
à p. 12 - 30.
10. Push in the stair tread;
à p. 12 - 112.
11. Fold up and secure the ladder in front of the crane cab;
à p. 3 - 77.