Rigging work
12.7 Rigging work on the main boom
Operating manual 3 302 819 en 12 - 87
GMK3060
13.12.2018
– Rope end fitting
• Fasten the rope end fitting (3) using the pin (2).
(A) – If there are an even number of lines to a
fixed point (1) of the main boom head.
(B) – If there are an odd number of lines to a
fixed point (1) of the hook block.
• Secure the pin (2) with the safety hinged pin.
Securing the hoist rope
• Insert the rods (1), (2) and (5).
• Secure all the rods.
Closing the hook block
• Fold up the plates (4) on both sides.
• Insert the rods (3) and secure them.
s