EasyManua.ls Logo

Manitowoc GROVE GMK3060

Manitowoc GROVE GMK3060
906 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.7 Rigging work on the main boom
Operating manual 3 302 819 en 12 - 103
GMK3060
13.12.2018
Removing You must remove the rod with the anemometer/air traffic control light before
driving on the road.
Switch off the air traffic control light.
Remove the plug and close the sockets (4)
and (5) with the protective caps.
Wind the cables on to the clamps (2).
Remove the rod (1) from the clamp (3).
For transportation, fasten the retaining pins to
the rod (1).
For transport
Place the rod (1) in the holder (2).
Secure the rod (1) using the retaining pins.

Table of Contents

Related product manuals