EasyManua.ls Logo

Metrohm 900 - Page 149

Metrohm 900
553 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
■■■■■■■■■■■■■■■■■■■■■■
13 GLP manager
900 Touch Control
■■■■■■■■
133
[GLP test interval]
Defining the time interval for the GLP test (see "Dialogs "GLP test "Mea-
surement" / Test interval" and "GLP test "Titration" / Test interval"", page
133).
[Hardware]
Documenting the hardware with which the GLP test was carried out (see
"Dialogs "GLP test "Measurement" / Hardware" and "GLP test "Titra-
tion" / Hardware"", page 134).
Dialogs "GLP test "Measurement" / Test interval" and "GLP
test "Titration" / Test interval"
Test date
Date on which the GLP was carried out.
Format: YYYY:MM:DD
Monitoring
on | off (Default value: off)
If this parameter is activated, then the time interval after which a GLP test
has to be carried out again will be monitored.
GLP test interval
If you define a time interval for the GLP test, then the date in Next GLP
test will be tracked automatically.
Input range 1 to 999 days
Default value 999 days
Next GLP test
If you define a date for the next GLP test, then the GLP test interval will
be tracked automatically.
Format: YYYY:MM:DD
Action
Selection of the action which is carried out when the time interval has
expired.
Selection Display message | Document message | Cancel
determination
Default value Display message
For all three options it is documented in the deter-
mination data (see dialog More determination
data / Messages), that the time interval has been
expired.

Table of Contents

Related product manuals