32
Performance Verification
Running PV Tests
454 Evolution 200 Series User Guide Thermo Scientific
Related Topics
Overview of PV
Running PV Tests
Running PV Tests
Y To run PV tests
1. Click Performance Verification in the right pane in Home.
The available tests appear in the right pane.
2. Select the tests to run.
To select or deselect all the listed tests, double-click Run above the column of check
boxes.
3. For selected tests that require it, enter information such as wavelength, value and
tolerance in the provided boxes.
Heed the following precaution if using an accessory:
Languages
Note Select the Classic group in Home if Performance Verification is not available
for the current group.
Note The CVC performance tests appear only when a CVC is properly installed and
a valid calibration file has been loaded. See Calibrated Validation Carousel (CVC) for
instructions. The available tests depend on the type of CVC installed.
Note Tests that require the Mercury Lamp Calibration accessory can be selected only
after the accessory has been properly connected and installed in the instrument.
CAUTION Avoid pinch hazard. Keep hands and objects clear of the accessory during
operation.
ATTENTION Évitez tout risque de pincement. Gardez vos mains, ainsi que tout objet, à
l’écart de l’accessoire pendant l’initialisation.