Configuring Test Plans
4-72 72A-1898 Rev. A 11/01
Monday, November 26, 2001 1:09 pm
2. Click Run Continuity Test.
The Run Continuity Test window appears (Figure 4.44).
Figure 4.44 Run Continuity Test
3. Click Continue.
Once the test data is loaded, an alarm sounds from the TDR9000.