TDR9000
Circuit Breaker Test System User’s Guide
72A-1898 Rev. A 11/01 1-21
Monday, November 26, 2001 1:09 pm
Running the Continuity Test produces the Test Results window shown in
Figure 1.16.
Figure 1.16 Continuity Test Results
Step 3: Performing the Pretest Checklist
Use the checklist given in Table 4.8 on page 4-70 to ensure that the
system is safely configured for testing, then reapply DC power to the
circuit breaker Trip and Close circuits.
Step 4: Running the Test
Figure 1.17 shows the initial window for running a Trip (O) test.
Figure 1.17 Run Test