EasyManua.ls Logo

doble TDR9000 - Setup and Operation; First Trip;Close Tests

doble TDR9000
454 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
72A-1898 Rev. A 11/01 4-1
Monday, November 26, 2001 1:09 pm
4. Setup and Operation
This chapter contains sections that discuss the following:
Safety recommendations for use with the TDR9000
Site preparation, including:
Setting up the circuit breakers being tested
Configuring the TDR9000 Test Plan
Configuring TDR9000 connections
Running a test
This chapter also discusses test safety recommendations, wiring, and
running First Trip/Close tests. Since First Trip tests require that the circuit
breaker be energized, references to discussions of test setup are found in
”First Trip/Close Tests”. Once test setup is complete, move to ”Using the
Pretest Checklist” on page 4-70 and proceed with the rest of the chapter
to run the test and disconnect after the test is complete.
First Trip/Close Tests
Specific discussions for First Trip/Close tests occur in the following
places:
”Safety Considerations: First Trip/Close Tests” on page 4-2
”First Trip/Close Virtual Front Panel Configuration” on page 4-2
”Configuring Analog/Auxiliary Channels for First Trip/Close Tests”
on page 4-4
”Running a First Trip/Close Test: Special Considerations”
on page 4-75
”Disconnecting After a First Trip/Close Test” on page 4-101

Table of Contents

Related product manuals