EasyManua.ls Logo

doble TDR9000 - Page 28

doble TDR9000
454 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 1: Circuit Breaker Preparation
1-2 72A-1898 Rev. A 11/01
Monday, November 26, 2001 1:09 pm
5. Connecting the Breaker Control cable to the control circuit of the
circuit breaker
6. Connecting the:
a. Trip leads across the terminals of the manual Trip switch on
the circuit breaker control panel
b. Close leads across the terminals of the manual Close switch
on the circuit breaker control panel
Alternately, connect the two trip leads between the +DC voltage and
the trip coil and the two close leads between the +DC voltage and the
close coil.
7. Connect either:
An OCB Contact Monitor cable to the appropriate circuit breaker
bushings as listed in Table 1.1
or
The EHV Contact Monitor cables to the appropriate circuit
breaker bushings as listed in Table 1.2.

Table of Contents

Related product manuals