GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
8-92 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-37-3 Removal procedure (cont’d)
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-37-4 Mounting Procedure
Install the new parts in the reverse order of removal.
Table 8-38 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-37. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-8-6
Front caster/Rear caster Function Validation
Procedure
Section 10-5-5
Physical Inspection