EasyManua.ls Logo

GE LOGIQ P5

GE LOGIQ P5
532 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
Section 3-5 - Completing the Installation 3-13
3-5-1-2 Power Up Sequence
1.) The Start Up Screen will be shown on the Monitor display when the system is turned ON.
2.) After initialization is complete, all lighted buttons on the Control Panel light and the default B-Mode
screen or Patient screen (no probes are connected) is displayed on the monitor display.
3-5-1-3 Power Up Sequence
NOTE: To enter the Maintenance Mode, select Maintenance button.
NOTE: Figure 3-11 on page 3-13 displays when Service Dongle inserted in Rear Panel.
NOTE: Start is selected automatically when it time out.
NOTE: In case the system is locked with task manager, use arirang as a password to unlock the
system.
Figure 3-10 Start Up Screen Display
Figure 3-11 Start Application Window

Table of Contents

Other manuals for GE LOGIQ P5

Related product manuals