EasyManuals Logo

GE LOGIQ P5 Service Manual

GE LOGIQ P5
532 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #360 background imageLoading...
Page #360 background image
GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
8-114 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-50 Fuse Set
8-2-50-1 Tools
Common pilIips screwdrivers
Allen/Unbraco wrench
Stubby screwdriver (Flat tip and Cross tip)
8-2-50-2 Preparations
Shut down the system and switch off the main breaker.
8-2-50-3 Removal procedure
1.) Remove the AC Transbox assy. Refer to the 8-2-49 "Transbox Assy 110V/220V" on page 8-109.
2.) Replace the 2 fuses located on the ACPC assy in the transbox assy.
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-50-4 Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-151 FUSE in Transbox assy
Table 8-51 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 2+, Section 8-2-50. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-9-14
Fuse set Function Validation Procedure
Section 10-5-2-2
Peripheral/Option Checks

Table of Contents

Other manuals for GE LOGIQ P5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P5 and is the answer not in the manual?

GE LOGIQ P5 Specifications

General IconGeneral
Power Supply100-240VAC, 50/60Hz
Display15" LCD
Doppler ModesColor Doppler, Power Doppler
Imaging ModesB-Mode, M-Mode
ProbesConvex, Linear, Phased Array
ApplicationsAbdominal, Vascular, Cardiac, OB/GYN, Small Parts, Musculoskeletal
ConnectivityDICOM, USB, Ethernet
Probe Connectors3
PortabilityMobile
Operating Temperature10°C to 40°C
Relative Humidity30%

Related product manuals