EasyManuals Logo

GE LOGIQ P5 Service Manual

GE LOGIQ P5
532 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #365 background imageLoading...
Page #365 background image
GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
Section 8-3 - Software Loading Procedure 8-119
Section 8-3
Software Loading Procedure
8-3-1 General
This describes a full system software loading (Base Software Load Image + Arirang Application Load
Image) procedure.
Use this instruction when:
- Performing the HDD with new one (Base Software Load Image + Arirang Application Load Image)
- Performing the system revision-up (Application)
8-3-2 Parts Required
LOGIQ™ P5 Base Software DVD
LOGIQ™ P5 Application Software CD
Blank CD-Rs (for patient image backup) or DVDs
Service Dongle
NOTE: Patient Image Data will be deleted when all the drives are ghosted. Back up them on the CD-
R or DVD before starting software loading
NOTE: Insert the service dongle into this service port located at the rear panel before installing the
Base System Software Load image
8-3-3 TimeRequired
Approximately 2hours

Table of Contents

Other manuals for GE LOGIQ P5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P5 and is the answer not in the manual?

GE LOGIQ P5 Specifications

General IconGeneral
Power Supply100-240VAC, 50/60Hz
Display15" LCD
Doppler ModesColor Doppler, Power Doppler
Imaging ModesB-Mode, M-Mode
ProbesConvex, Linear, Phased Array
ApplicationsAbdominal, Vascular, Cardiac, OB/GYN, Small Parts, Musculoskeletal
ConnectivityDICOM, USB, Ethernet
Probe Connectors3
PortabilityMobile
Operating Temperature10°C to 40°C
Relative Humidity30%

Related product manuals