Crane operation
11.4 Operation of the rated capacity limiter
Operating manual 3 302 819 en 11 - 43
GMK3060
13.12.2018
The confirmed boom system (1) or (2) is
displayed.
Reeving
• (A) – Select and confirm the display for the
hoist to be used for lifting the load, e.g.
display (1) for the main hoist – symbol (3)
is orange.
• (B) – Select the currently rigged reeving (2),
e.g. 8-fall.
• Confirm the selection and leave the display (1) –
symbol (3) grey.
s