Page #128 background imageLoading...
Page #128 background image
STONEX R2
124
Aim at the ground point (base point)
where the prism is set, and press [F4]
(V-ANG). The base point is set up.
Aim at the
top of the
prism
+
[F4]
Base Point
Sight Meas Base Pt
BasePt 10
R.HT 0.000 m
1.968 m
V 92°05′52″
BACK V-ANG
Aim at the target point (remote
height point) to view the result.
Remote Point
Sight Meas REM Pt!
BasePt 10
RemPt: 11
: 1.969 m
1.144 m
H 2.014 m
BasePt SAVE
The related soft keys in hanging-height measurement:
[F1]([BasePt]): Input and measurement of a new base point.
[F4]([SAVE]): Saves the measured data.
5.12 ROAD
This program enables you to easily define a line or curve or spiral as a reference for
measurements and stake outs. It supports chainages, as well as incremental stake-outs and
offsets.
Before starting road design and stake-out, user should set job, station, and orientation
first.
5.12.1 Define HZ Alignment
There are two methods to define HZ Alignment:
One is to define HZ Alignment via Line, Arc or Sprial;
The other is to define HZ Alignment via points.
When using Line, Arc or Sprial to define HZ Alignment, the second method is restricted;
similarly, when using points to define HZ Alignment, the first method is restricted. The
two methods cant mix.
Roads
F1 Define HZ Alignment F1
F2 Define VT Alignment F2
F3 Stake Out Roads F3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the STONEX R2 and is the answer not in the manual?

STONEX R2 Specifications

General IconGeneral
BrandSTONEX
ModelR2
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals