EasyManuals Logo

STONEX R2 User Manual

STONEX R2
220 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #146 background imageLoading...
Page #146 background image
STONEX R2
142
Explanation for Point ID:
The number behind C is the chainage.
+ Means to stake out points of the right chainage. While staking out points of the left
chainage, it shows “-.
+ (or-) behind the number is the distance between points of right chainage and central line,
i.e. the data of the right offset (or left offset) data. Here, the points on the central line read
0.0.
For instance: PtID C100+2.0 expresses the point on the right chainage is 2 m away from
the central line, with a chainage of 100.
5.12.8 Slope Stake-Out
Slope Stake Out can be launched as part of the Alignment Stake-Out. It is a must to define
horizontal and vertical alignments in Road menu previously. In stake-out main screen,
press [F1] (SLOPE) to display Slope Stake Out.
Main Screen of Slope Stake Out
Indeed, the fill/ cut value that are input here is a ratio.
The fill/dig data can be entered through left and right slopes. In terms of fill/dig, use
positive symbol to input the required slope, the software selects an appropriate slope in
the list according to the actual position of the point.
AlignmentS-O1/3
PtID C100+0.0
R.HT 2.000 m
Hz 20°00′05″
25.369 m
---.--- m
All DIST RECORD
VIEW EDM NEXT ∣←
Slope Stake Out
Left(1n)
Cut 1.350
Fill 1.000
Right(1: n)
Cut 1.200
Fill 1.650
LEFT RIGHT

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the STONEX R2 and is the answer not in the manual?

STONEX R2 Specifications

General IconGeneral
BrandSTONEX
ModelR2
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals