EasyManua.ls Logo

STONEX R2 - Page 142

STONEX R2
220 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STONEX R2
138
Coordinate Offset
Stake- Out
X/ N: X coordinate offset between
stake-out point and the present
measurement point.
Y/ EY coordinate offset between
stake-out point and the present
measurement point.
Alignment S-O3/3
PtID C100+0.0
R.Ht 2.000 m
X/N 89.212 m
Y/E 92.369 m
H ---.--- m
All DIST RECORD
Press [PAGE] to switch among the three stake-out mode.
Here, take Polar Stake-Out as an example to introduce the operation steps of alignment
stake-out in detail. For more information about other methods of stake-out, please refer to
“5.6 STAKE OUT”.
OPERATIONAL STEPS (Take points on the central line for example.)
OPERATIONAL STEPS
OPERATION
DISPLAY
Set job, station and orientation first,
then in Road menu, press [F4] to enter
into Road function.
[F4]
Roads
[ * ] F1 Setting Job (1)
[ * ] F2 Setting Station (2)
[ * ] F3 Set Orientation (3)
F4 Start (4)
Define horizontal alignment and
vertical alignment (as required to
compute fill/dig). Press [F3] to start
Stake Out Roads program.
Roads
F1 Define HZ Alignment
F2 Define VT Alignment
F3 Stake Out Roads

Table of Contents

Related product manuals