EasyManua.ls Logo

Suzuki Wagon R Plus RB310 - Page 235

Suzuki Wagon R Plus RB310
846 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-2-60 ENGINE GENERAL INFORMATION AND DIAGNOSIS (M13 ENGINE)
9 Main Relay Check
1) Measure resistance between each two terminals of main
relay. (See Fig. 3).
Between main relay terminals
A and B: Infinity
C and D: 160 240
at 20°C (68°F)
2) Check that there is continuity between terminals A and
B when battery is connected to terminals C and D
(See Fig. 4).
Is main relay in good condition?
BLU/BLK wire
open circuit or
high resistance cir-
cuit.
Replace main
relay.
Step Action Yes No
[A]: Fig. 1 for Step 3 [C]: Fig. 3 for Step 9 1. FI fuse (20 A)
[B]: Fig. 2 for Step 7 [D]: Fig. 4 for Step 9 2. Main relay
[A] [B]
[D][C]
1
2

Table of Contents

Related product manuals