EasyManua.ls Logo

Suzuki Wagon R Plus RB310 - Radiator Removal and Installation

Suzuki Wagon R Plus RB310
846 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6B2-12 ENGINE COOLING (M13 ENGINE)
Check thermostatic movement of wax pellet as follows:
a) Immerse thermostat (1) in water, and heat water gradually
as shown.
b) Check that valve starts to open at specific temperature.
Temperature at which valve begins to open
: 80 84°C (176 183°F)
Temperature at which valve become fully open
: 95 97°C (203°F)
Valve lift
: More than 8 mm (0.315 in.) at 95°C (203°F)
If valve starts to open at a temperature substantially below or
above specific temperature, thermostat unit should be replaced
with a new one. Such a unit, if reused, will bring about overcooling
or overheating tendency.
Radiator Removal and Installation
Removal
1) Disconnect negative cable at battery.
2) Drain cooling system referring to Cooling System Draining
in this section.
3) Remove cooling fan assembly referring to Radiator Cooling
Fan Removal and Installation in this section.
4) Remove radiator outlet hose (1) from radiator (2).
5) Remove radiator (2) from vehicle.
Installation
Reverse removal procedures noting the followings.
Refill cooling system referring to step 7) to 22) of Cooling
System Flush and Refill in this section.
After installation, check each joint for leakage.
2. Thermometer
3. Heater
2
1

Table of Contents

Related product manuals